Copper Run

Install

Treat the line set like the machine.

The head is what you see. The vacuum, flare, drain, and circuit decide whether it still runs in August on Center Star Road.

Room and panel

West glass, vaulted shop ceilings, and how many people live in the room change the BTU. Then the panel — 115V on some 9k/12k, 230V on the bigger boxes.

Head and condenser

High on the wall with a drain path. Outdoor unit on a pad or bracket. Manufacturer clearances, not a plant bed.

Permit

New mini splits need a mechanical permit with the AHJ in Spring Hill, Williamson, Columbia, and Franklin. Maury County does not require a permit for this work. Spring Hill exempts some like-for-like replacements — a new head is not that exemption.

Copper, vacuum, charge

Clean flares. Evacuate to spec. Add charge if the run beats the factory precharge. This is the name of the company.

Condensate

Gravity when the wall allows it. Pump only when it does not. No drain on the sidewalk.

Startup

Cool and heat check. Remote and app. Model and serial on the ticket. Warranty registration when the portal is up.

License line

Tennessee HVAC work of $25,000 or more generally needs a state CMC / CMC-C. Smaller jobs still need permits, insurance, and EPA 608 on anyone who opens the circuit. License number goes in the footer before the first deposit. Licensing page.

CallText